base plate. pit formation of grillage is completed. Forms formwork vertical structures of lower level underground parking. Raft foundation is top pile, pier foundation. Home construction.图片
点 击 查 看 大 图

base plate. pit formation of grillage is completed. Forms formwork vertical structures of lower level underground parking. Raft foundation is top pile, pier foundation. Home construction.
素材ID:308560315

  • 举报
  • 格式:JPG
  • 作者:MDF
  • 最大分辨率:5184 x 3456px
  • 最大输出:43.89 x 29.26cm (300dpi) | 182.88 x 121.92cm (72dpi)

关键词

体系结构钻孔钢筋沙子工业挖掘平衡块水泥现场工作场所整料债券行业道具结构设备施工大厦建设者房子色谱柱钢筋建筑潮湿夏季