A construction worker efficiently operates a concrete pump to pour concrete onto heated flooring installed with red hoses for a modern building project's thermal system.图片
点 击 查 看 大 图

A construction worker efficiently operates a concrete pump to pour concrete onto heated flooring installed with red hoses for a modern building project's thermal system.
素材ID:1766680853

  • 举报
  • 格式:JPG
  • 作者:Daniela
  • 最大分辨率:6048 x 4024px
  • 最大输出:51.21 x 34.07cm (300dpi) | 213.36 x 141.96cm (72dpi)

关键词

工艺能源电源安全装修发展地板机械系统审美加热移动环境红色地板效率团队合作现代行业结构当代设备设计浇筑施工技术基础安装建筑劳动力创新工具混凝土进度住宅商业