Milled road with delayed repaving. Pedestrian pathway of disrepair after being milled. Asphalt, Prepped surface. Surface ready for paving. Temporary wooden protective fencing for trees and shrubs.图片
点 击 查 看 大 图

Milled road with delayed repaving. Pedestrian pathway of disrepair after being milled. Asphalt, Prepped surface. Surface ready for paving. Temporary wooden protective fencing for trees and shrubs.
素材ID:1765526065

  • 举报
  • 格式:JPG
  • 作者:AB-7272
  • 最大分辨率:4032 x 3024px
  • 最大输出:34.14 x 25.60cm (300dpi) | 142.24 x 106.68cm (72dpi)

关键词

保护路面城市道路工作机器混乱种植方式咀嚼污垢已移除铣削撕裂之后围墙损伤已剥离图层失修脚踏表面铣削撕裂施工围栏删除延迟街道沥青木制修理磨碎摊铺灌木