Action of a project manager is writing on risk assessment matrix form to rating the risk of house building structure or building quality (as blurred background. Industrial working scene, close-up.图片
点 击 查 看 大 图

Action of a project manager is writing on risk assessment matrix form to rating the risk of house building structure or building quality (as blurred background. Industrial working scene, close-up.
素材ID:1643754214

  • 举报
  • 格式:JPG
  • 作者:Nattawit
  • 最大分辨率:7952 x 5304px
  • 最大输出:67.33 x 44.91cm (300dpi) | 280.53 x 187.11cm (72dpi)

关键词

保护体系结构咨询评估安全评估项目发展管理可能性图纸报告承包商检查表准确性房地产文书工作工业工程工程师刨削控制规划维护保养危害现场行业结构文档战略施工评价风险剪贴板建设者安装检查房子领班检查建筑财产事故主管业绩正在检查危险